Use the same account, period and currency. CSV/TSV: up to 5 MB and 10,000 records per file.
Preparing your CSV?
In Excel, save as CSV UTF-8. Keep one header row and transaction rows only; remove titles, opening balances and subtotals. PDF and XLSX files are not supported.
Contains fictional sample data — replace both files to use your own records
Choose two files, or try the sample.
02 / Review the differences
Your matching review
Pairs to review
Unmatched bank records
Unmatched books records
Net movement difference
This is not a completed bank reconciliation. Equal totals are not proof: verify opening/closing balances, completeness and every pair.
About record numbers
Numbers count CSV records, including the header and blank records. A multiline cell can span several text lines.
Status
Bank record
Books record
Why / review note
Action
Pair unmatched records
Pair equal signed amounts only after verifying the source, even if dates or references differ. A review note is required.
Includes every record, review note and control total. Download before leaving; in Excel, import reference columns as text to preserve leading zeroes.
First: equal reference and signed amount within your date window. Next: a unique equal-amount candidate within that window. A pair must be unique from both sides. References ignore letter case and surrounding spaces, but retain punctuation and leading zeroes.
What needs review
Conflicting references, zero amounts and ambiguous candidates stay unmatched. Missing records may reflect timing differences, fees or incomplete exports. Invalid input rows block the run; none are silently skipped.
What stays private
Files, mappings, notes and results stay in this tab’s memory and are cleared on reload. Site analytics record visits and successful non-sample use/downloads—not file contents or filenames.
Tool limits
No PDF/XLSX import, bank connection, foreign exchange, fuzzy matching, split/batch settlements, balance certification or accounting-system changes. Amounts must match to the cent. Suggested pairs are not automatic approvals.