Free construction finance tool. No signup.
Lien waiver form generator
Choose the waiver type and the project’s state, fill in the payment details, and download the waiver as a PDF or Word file. In states that require a statutory form, the generator uses the statute’s wording or tells you where to get it.
Waiver details
The starting values are an illustrative job. The waiver is built in your browser and nothing you enter is sent anywhere.
Preview and download
Conditional Waiver and Release on Progress Payment
| Claimant | Ridgeline Drywall LLC |
|---|---|
| Customer | Summit Builders Inc. |
| Owner | Larimer Medical Partners LLC |
| Project | Larimer Clinic, Phase 2 |
| Project address | 2150 E Harmony Rd, Fort Collins, CO 80528 |
| Through date | October 31, 2026 |
| Payment amount | $48,250.00 |
| Paid by | Summit Builders Inc. |
This waiver and release takes effect only when the claimant has received payment of $48,250.00 from Summit Builders Inc. and, if the payment is made by check, the check has been paid by the bank it is drawn on. When that happens, the claimant waives and releases any mechanic’s lien rights, payment bond rights, and other claims it has against the property, the owner, or any payment bond on the project, for labor, services, equipment, and materials furnished to Summit Builders Inc. on the project through October 31, 2026.
This waiver and release does not cover retainage held back from this or earlier payments, extras or change orders the claimant has not been paid for, work or materials furnished after the through date, or the exceptions listed below.
| Exceptions | None |
|---|
| Claimant | Ridgeline Drywall LLC |
|---|---|
| Signature | ____________________ |
| Name | Dana Ortiz |
| Title | Controller |
| Date | ____________________ |
The preview updates as you type.
This is a form, not legal advice. Lien law differs by state and by type of project, and your contract may call for specific wording. Have your attorney review a waiver before you rely on it.
The four types of lien waiver
Every lien waiver answers two questions. Does it cover one payment or the whole job, and does it take effect when signed or only once the money arrives?
- Conditional progress
- Releases lien rights for work through a stated date, but only once the stated payment is received. It is usually sent with the pay application, before the payment is made.
- Unconditional progress
- Releases lien rights for work through a stated date, effective when signed. It is usually sent after the payment has cleared, often with the next pay application.
- Conditional final
- Releases all remaining lien rights on the job once the final payment is received. It is sent with the request for final payment, which often includes retainage.
- Unconditional final
- Releases all remaining lien rights on the job, effective when signed. It is sent after the final payment has cleared and closes out the claimant’s lien rights on the project.
Which waiver to use
On most jobs the pattern repeats each month. The subcontractor sends a conditional progress waiver with this month’s pay application. Once the payment for that application clears, the subcontractor sends an unconditional progress waiver for the same amount and through date, usually along with next month’s application. At the end of the job the same pattern happens once more with the final waivers.
Match each waiver to the payment it covers. Check that the claimant is the company you are paying, that the job is right, that the through date matches the end of the billing period, and that the amount is the amount you are paying. A waiver for last month’s draw does not cover this month’s.
The risk in an unconditional waiver
An unconditional waiver gives up lien rights the moment it is signed. If a claimant signs one before being paid and the check bounces or never arrives, the claimant may have no lien left to fall back on. That is why claimants should sign a conditional waiver until the money has cleared, and only then sign the unconditional one.
For the paying side, the risk runs the other way. A conditional waiver protects you only if the payment it describes is actually made. If you pay a different amount, pay late, or pay a different party, the conditional waiver may not release anything, so ask for the unconditional waiver once the payment clears.
States with a statutory lien waiver form
In these states the statute sets the wording of a lien waiver. Except in Florida, where the forms are optional, a waiver that does not follow the statutory form may not be enforceable. For every other state, the generator produces a general form you can adapt to your contract.
- Arizona
- A.R.S. § 33-1008. Arizona sets four forms: conditional and unconditional, on progress and on final payment. A waiver must substantially follow the form, and the unconditional forms must include the statute’s notice in type at least as large as the rest of the document. No notary is required. This tool fills in the statutory form.
- California
- Cal. Civ. Code §§ 8132–8138. California sets four forms: conditional and unconditional, on progress and on final payment. A waiver that is not substantially in the statutory form is not enforceable (Civ. Code § 8124). No notary is required. This tool fills in the statutory form.
- Florida
- Fla. Stat. § 713.20. Florida has optional statutory forms for progress and final payments. A waiver in another form is still enforceable on its terms, but a payer may not require a lienor to sign a waiver that differs from the statutory form.
- Georgia
- O.C.G.A. § 44-14-366. Georgia sets two forms, one for interim payments and one for final payment, with no separate conditional or unconditional version. The waiver takes effect on payment, or 90 days after the date in it unless the claimant files an affidavit of nonpayment. It must be in at least 12-point type. The link is the 2020 act (SB 315) that set the current forms, in effect since January 1, 2021. This tool fills in the statutory form.
- Massachusetts
- M.G.L. c. 254, § 32. Massachusetts sets one form, the Partial Waiver and Subordination of Lien, for contractors who have filed a notice of contract. It must follow the form with no material deviation. This tool links to the official form instead of generating it.
- Michigan
- MCL 570.1115. Michigan sets four forms: partial and full, conditional and unconditional, to be used in substantially the statutory format on all projects. No notary is required. This tool fills in the statutory form.
- Mississippi
- Miss. Code Ann. § 85-7-433. Mississippi sets two forms, one for interim payments and one for final payment, with no separate conditional or unconditional version. Both are sworn before a notary. The waiver is treated as paid 60 days after the date in it unless the claimant files an affidavit of nonpayment or a lien. The link is the 2014 act (SB 2622) that created the forms. This tool fills in the statutory form.
- Missouri
- RSMo § 429.016. Missouri sets one form, the Unconditional Final Lien Waiver for Residential Real Property, which is valid only if it is substantially in the statutory form. Missouri has no statutory form for other waivers. This tool links to the official form instead of generating it.
- Nevada
- NRS 108.2457. Nevada sets four forms: conditional and unconditional, on progress and on final payment. A waiver that is not in the statutory form is not enforceable. No notary is required. This tool links to the official form instead of generating it.
- Texas
- Tex. Prop. Code § 53.284. Texas sets four forms: conditional and unconditional, on progress and on final payment. A waiver must substantially comply with the form, and the unconditional forms must start with the notice in bold type of at least 10 points. No notary is required for original contracts entered on or after January 1, 2022; earlier contracts still call for a notarized waiver. This tool fills in the statutory form.
- Utah
- Utah Code § 38-1a-802. Utah sets its own waiver and release forms, and a waiver is enforceable only if it is in the statutory form and the payment was received. No notary is required. This tool links to the official form instead of generating it.
- Wyoming
- Wyo. Stat. § 29-10-101(b). Wyoming sets one lien waiver form for payments received to date, completed in substantially the statutory form, with a notary acknowledgment. This tool fills in the statutory form.
Checking waivers before you pay
If you are on the paying side, the ProcIndex lien waiver agent checks each subcontractor’s waiver against the payment it should cover and holds the payment in your ERP until the right waiver is on file.
Related
Common questions
- What is a lien waiver?
- A lien waiver is a signed document in which a contractor, subcontractor, or supplier gives up its right to file a mechanic’s lien, and usually its right to claim against a payment bond, for work it has been paid for or is about to be paid for. Owners, lenders, and general contractors collect one with each payment so that work already paid for cannot later become a lien on the property.
- What is the difference between a conditional and an unconditional lien waiver?
- A conditional waiver takes effect only when the payment it describes is actually received, and for a check, when the check clears. An unconditional waiver takes effect as soon as it is signed, whether or not the money arrived. Claimants should sign an unconditional waiver only after the payment has cleared.
- What is the difference between a partial and a final lien waiver?
- A partial waiver, also called a progress waiver, covers one payment for work through a stated date. Retainage and later work are not covered. A final waiver covers all work on the project and is used for the last payment, which often includes the release of retainage.
- Which states require a statutory lien waiver form?
- Arizona, California, Georgia, Massachusetts, Michigan, Mississippi, Missouri, Nevada, Texas, Utah, and Wyoming set lien waiver forms by statute, and a waiver that does not follow the statutory form may not be enforceable there. In Massachusetts and Missouri the form covers only one kind of waiver. Florida has statutory forms that are optional. The list on this page gives the statute for each state.
- Does a lien waiver need to be notarized?
- Usually not. Of the states with statutory forms, the Mississippi and Wyoming forms are signed before a notary, and Texas waivers need notarizing only for contracts entered before January 1, 2022. Some owners, lenders, and title companies ask for a notarized waiver anyway, so check the contract or the draw requirements.
- Can I edit the Word file?
- Yes. The Word download opens in Microsoft Word or Google Docs. If the project is in a state with a statutory form, do not change the statutory wording, only the blanks.
- Is anything I type saved or sent to ProcIndex?
- No. The waiver is built in your browser, and nothing you enter is stored or sent anywhere. Reloading the page clears the form.